other relevant information (7.1.2)

Sr. No. Description Url
01 Building construction (LED) Building construction (LED)
02 Wheeling to the Grid Wheeling to the Grid
03 Wheeling to the Grid (Energy Audit) Wheeling to the Grid (Energy Audit)
04 Energy Efficient Bulbs Purchase Energy Efficient Bulbs Purchase
05 Handing Over Exam Building (Installed Power Efficient Practices) Handing Over Exam Building (Installed Power Efficient Practices)
06 LED Purchase and Light Sensor-Purchase LED Purchase and Light Sensor-Purchase
07 Solar Panel (200 KW) Solar Panel (200 KW)
08 Solar Panel (50 KW) Solar Panel (50 KW)
09 Solar Panel (5KW) Solar Panel (5KW)
10 Solar Water Heater (Work Order) Solar Water Heater (Work Order)
11 Water Controller (Power Efficient Practices) Water Controller (Power Efficient Practices)